The lovely asbestos tiles, which were under the laminate flooring. We had to pry these both off the floor before we could start tiling.
John working at prying up layer #3 of the flooring (we originally weren't going to mess with the floor that much, but had to because it was warped in some areas)
John finishing with layer #4. After he was done with this, he decided to pry up another layer, just for fun (so 5 total layers of flooring!)