Pages

Monday, October 11, 2010

Demolition Pictures


The lovely asbestos tiles, which were under the laminate flooring. We had to pry these both off the floor before we could start tiling.

John working at prying up layer #3 of the flooring (we originally weren't going to mess with the floor that much, but had to because it was warped in some areas)

John finishing with layer #4. After he was done with this, he decided to pry up another layer, just for fun (so 5 total layers of flooring!)

No comments:

Post a Comment